Establishment of a solar energy production station
• Duration: 09/2024 - 03/2025
• Total budget: 63 591.55 €
• EU Funding: 15 766.50 €
Installation of solar panels on the roof of the second warehouse owned by SIA Rolands S, located at 10A Rencēnu Street, Riga, to produce electricity for self-consumption purposes. Installed renewable energy capacity: 100 kW. Reduction in greenhouse gas emissions: 10.27 tCO2.






