Installation of a solar energy station on the roof of the warehouse building

• Duration: 09/2024 - 03/2025

• Total Budget: 127 788.10 €

• EU Funding: 31 683.00 €

Installation of solar panels on the roof of the main warehouse owned by SIA Rolands S, located at 10A Rencēnu Street, Riga, to produce electricity for self-consumption purposes. Installed renewable energy capacity: 250 kW. Reduction in greenhouse gas emissions: 27.61 tCO2.