Solar Energy for SIA Rolands S Warehouse Complex
• Duration: 01/2025 - 04/2025
• Total budget: 64 525.00 €
• EU funding: 15 750.00 €
Installation of a solar panel park on the roof of Warehouse No. 3, owned by SIA Rolands S, at 10A Rencēnu Street, Riga, for self-consumption electricity production. Installed renewable energy capacity – 150 kW; greenhouse gas emission reduction – 20.09 tCO2.






